Greening the Government Through Efficient Energy Management Documents
Greening the Government Through Efficient Energy Management



Federal Register, Volume 64 Issue 109 (Tuesday, June 8, 1999)

[Federal Register Volume 64, Number 109 (Tuesday, June 8, 1999)]
[Presidential Documents]
[Pages 30851-30860]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 99-14633]
[[Page 30849]]
_______________________________________________________________________
Part IV
The President
_______________________________________________________________________
Executive Order 13123--Greening the Government Through Efficient Energy
Management
                        Presidential Documents
Federal Register / Vol. 64, No. 109 / Tuesday, June 8, 1999 /
Presidential Documents
___________________________________________________________________
Title 3--
The President
[[Page 30851]]
                Executive Order 13123 of June 3, 1999
Greening the Government Through Efficient Energy
                Management
                By the authority vested in me as President by the
                Constitution and the laws of the United States of
                America, including the National Energy Conservation
                Policy Act (Public Law 95-619, 92 Stat. 3206, 42 U.S.C.
                8252 et seq.), as amended by the Energy Policy Act of
                1992 (EPACT) (Public Law 102-486, 106 Stat. 2776), and
                section 301 of title 3, United States Code, it is
                hereby ordered as follows:
                PART 1--PREAMBLE
                Section 101. Federal Leadership. The Federal
                Government, as the Nation's largest energy consumer,
                shall significantly improve its energy management in
                order to save taxpayer dollars and reduce emissions
                that contribute to air pollution and global climate
                change. With more than 500,000 buildings, the Federal
                Government can lead the Nation in energy efficient
                building design, construction, and operation. As a
                major consumer that spends $200 billion annually on
                products and services, the Federal Government can
                promote energy efficiency, water conservation, and the
                use of renewable energy products, and help foster
                markets for emerging technologies. In encouraging
                effective energy management in the Federal Government,
                this order builds on work begun under EPACT and
                previous Executive orders.
                PART 2--GOALS
                Sec. 201. Greenhouse Gases Reduction Goal. Through
                life-cycle cost-effective energy measures, each agency
                shall reduce its greenhouse gas emissions attributed to
                facility energy use by 30 percent by 2010 compared to
                such emissions levels in 1990. In order to encourage
                optimal investment in energy improvements, agencies can
                count greenhouse gas reductions from improvements in
                nonfacility energy use toward this goal to the extent
                that these reductions are approved by the Office of
                Management and Budget (OMB).
                Sec. 202. Energy Efficiency Improvement Goals. Through
                life-cycle cost-effective measures, each agency shall
                reduce energy consumption per gross square foot of its
                facilities, excluding facilities covered in section 203
                of this order, by 30 percent by 2005 and 35 percent by
                2010 relative to 1985. No facilities will be exempt
                from these goals unless they meet new criteria for
                exemptions, to be issued by the Department of Energy
                (DOE).
                Sec. 203. Industrial and Laboratory Facilities. Through
                life-cycle cost-effective measures, each agency shall
                reduce energy consumption per square foot, per unit of
                production, or per other unit as applicable by 20
                percent by 2005 and 25 percent by 2010 relative to
                1990. No facilities will be exempt from these goals
                unless they meet new criteria for exemptions, as issued
                by DOE.
                Sec. 204. Renewable Energy. Each agency shall strive to
                expand the use of renewable energy within its
                facilities and in its activities by implementing
                renewable energy projects and by purchasing electricity
                from renewable energy sources. In support of the
                Million Solar Roofs initiative, the Federal Government
                shall strive to install 2,000 solar energy systems at
                Federal facilities by the end of 2000, and 20,000 solar
                energy systems at Federal facilities by 2010.
[[Page 30852]]
                Sec. 205. Petroleum. Through life-cycle cost-effective
                measures, each agency shall reduce the use of petroleum
                within its facilities. Agencies may accomplish this
                reduction by switching to a less greenhouse gas-
                intensive, nonpetroleum energy source, such as natural
                gas or renewable energy sources; by eliminating
                unnecessary fuel use; or by other appropriate methods.
                Where alternative fuels are not practical or life-cycle
                cost-effective, agencies shall strive to improve the
                efficiency of their facilities.
                Sec. 206. Source Energy. The Federal Government shall
                strive to reduce total energy use and associated
                greenhouse gas and other air emissions, as measured at
                the source. To that end, agencies shall undertake life-
                cycle cost-effective projects in which source energy
                decreases, even if site energy use increases. In such
                cases, agencies will receive credit toward energy
                reduction goals through guidelines developed by DOE.
                Sec. 207. Water Conservation. Through life-cycle cost-
                effective measures, agencies shall reduce water
                consumption and associated energy use in their
                facilities to reach the goals set under section 503(f)
                of this order. Where possible, water cost savings and
                associated energy cost savings shall be included in
                Energy-Savings Performance Contracts and other
                financing mechanisms.
                PART 3--ORGANIZATION AND ACCOUNTABILITY
                Sec. 301. Annual Budget Submission. Each agency's
                budget submission to OMB shall specifically request
                funding necessary to achieve the goals of this order.
                Budget submissions shall include the costs associated
                with: encouraging the use of, administering, and
                fulfilling agency responsibilities under Energy-Savings
                Performance Contracts, utility energy-efficiency
                service contracts, and other contractual platforms for
                achieving conservation goals; implementing life-cycle
                cost-effective measures; procuring life-cycle cost-
                effective products; and constructing sustainably
                designed new buildings, among other energy costs. OMB
                shall issue guidelines to assist agencies in developing
                appropriate requests that support sound investments in
                energy improvements and energy-using products. OMB
                shall explore the feasibility of establishing a fund
                that agencies could draw on to finance exemplary energy
                management activities and investments with higher
                initial costs but lower life-cycle costs. Budget
                requests to OMB in support of this order must be within
                each agency's planning guidance level.
                Sec. 302. Annual Implementation Plan. Each agency shall
                develop an annual implementation plan for fulfilling
                the requirements of this order. Such plans shall be
                included in the annual reports to the President under
                section 303 of this order.
                Sec. 303. Annual Reports to the President. (a) Each
                agency shall measure and report its progress in meeting
                the goals and requirements of this order on an annual
                basis. Agencies shall follow reporting guidelines as
                developed under section 306(b) of this order. In order
                to minimize additional reporting requirements, the
                guidelines will clarify how the annual report to the
                President should build on each agency's annual Federal
                energy reports submitted to DOE and the Congress.
                Annual reports to the President are due on January 1 of
                each year beginning in the year 2000.
                    (b) Each agency's annual report to the President
                shall describe how the agency is using each of the
                strategies described in Part 4 of this order to help
                meet energy and greenhouse gas reduction goals. The
                annual report to the President shall explain why
                certain strategies, if any, have not been used. It
                shall also include a listing and explanation of exempt
                facilities.
                Sec. 304. Designation of Senior Agency Official. Each
                agency shall designate a senior official, at the
                Assistant Secretary level or above, to be responsible
                for meeting the goals and requirements of this order,
                including preparing the annual report to the President.
                Such designation shall be reported by each Cabinet
                Secretary or agency head to the Deputy Director for
                Management of OMB within 30 days of the date of this
                order. Designated officials shall participate in the
                Interagency Energy Policy Committee, described in
                section
[[Page 30853]]
                306(d) of this order. The Committee shall communicate
                its activities to all designated officials to assure
                proper coordination and achievement of the goals and
                requirements of this order.
                Sec. 305. Designation of Agency Energy Teams. Within 90
                days of the date of this order, each agency shall form
                a technical support team consisting of appropriate
                procurement, legal, budget, management, and technical
                representatives to expedite and encourage the agency's
                use of appropriations, Energy-Savings Performance
                Contracts, and other alternative financing mechanisms
                necessary to meet the goals and requirements of this
                order. Agency energy team activities shall be
                undertaken in collaboration with each agency's
                representative to the Interagency Energy Management
                Task Force, as described in section 306(e) of this
                order.
                Sec. 306. Interagency Coordination. (a) Office of
                Management and Budget. The Deputy Director for
                Management of OMB, in consultation with DOE, shall be
                responsible for evaluating each agency's progress in
                improving energy management and for submitting agency
                energy scorecards to the President to report progress.
                      (1) OMB, in consultation with DOE and other
                agencies, shall develop the agency energy scorecards
                and scoring system to evaluate each agency's progress
                in meeting the goals of this order. The scoring
                criteria shall include the extent to which agencies are
                taking advantage of key tools to save energy and reduce
                greenhouse gas emissions, such as Energy-Savings
                Performance Contracts, utility energy-efficiency
                service contracts, ENERGY STAR and other
                energy efficient products, renewable energy
                technologies, electricity from renewable energy
                sources, and other strategies and requirements listed
                in Part 4 of this order, as well as overall efficiency
                and greenhouse gas metrics and use of other innovative
                energy efficiency practices. The scorecards shall be
                based on the annual energy reports submitted to the
                President under section 303 of this order.
                      (2) The Deputy Director for Management of OMB
                shall also select outstanding agency energy management
                team(s), from among candidates nominated by DOE, for a
                new annual Presidential award for energy efficiency.
                    (b) Federal Energy Management Program. The DOE's
                Federal Energy Management Program (FEMP) shall be
                responsible for working with the agencies to ensure
                that they meet the goals of this order and report their
                progress. FEMP, in consultation with OMB, shall develop
                and issue guidelines for agencies' preparation of their
                annual reports to the President on energy management,
                as required in section 303 of this order. FEMP shall
                also have primary responsibility for collecting and
                analyzing the data, and shall assist OMB in ensuring
                that agency reports are received in a timely manner.
                    (c) President's Management Council. The President's
                Management Council (PMC), chaired by the Deputy
                Director for Management of OMB and consisting of the
                Chief Operating Officers (usually the Deputy Secretary)
                of the largest Federal departments and agencies, will
                periodically discuss agencies' progress in improving
                Federal energy management.
                    (d) Interagency Energy Policy Committee. This
                Committee was established by the Department of Energy
                Organization Act. It consists of senior agency
                officials designated in accordance with section 304 of
                this order. The Committee is responsible for
                encouraging implementation of energy efficiency
                policies and practices. The major energy-consuming
                agencies designated by DOE are required to participate
                in the Committee. The Committee shall communicate its
                activities to all designated senior agency officials to
                promote coordination and achievement of the goals of
                this order.
                    (e) Interagency Energy Management Task Force. The
                Task Force was established by the National Energy
                Conservation Policy Act. It consists of each agency's
                chief energy manager. The Committee shall continue to
                work toward improving agencies' use of energy
                management tools and sharing information on Federal
                energy management across agencies.
[[Page 30854]]
                Sec. 307. Public/Private Advisory Committee. The
                Secretary of Energy will appoint an advisory committee
                consisting of representatives from Federal agencies,
                State governments, energy service companies, utility
                companies, equipment manufacturers, construction and
                architectural companies, environmental, energy and
                consumer groups, and other energy-related
                organizations. The committee will provide input on
                Federal energy management, including how to improve use
                of Energy-Savings Performance Contracts and utility
                energy-efficiency service contracts, improve
                procurement of ENERGY STAR and other energy
                efficient products, improve building design, reduce
                process energy use, and enhance applications of
                efficient and renewable energy technologies at Federal
                facilities.
                Sec. 308. Applicability. This order applies to all
                Federal departments and agencies. General Services
                Administration (GSA) is responsible for working with
                agencies to meet the requirements of this order for
                those facilities for which GSA has delegated operations
                and maintenance authority. The Department of Defense
                (DOD) is subject to this order to the extent that it
                does not impair or adversely affect military operations
                and training (including tactical aircraft, ships,
                weapons systems, combat training, and border security).
                PART 4--PROMOTING FEDERAL LEADERSHIP IN ENERGY
                MANAGEMENT
                Sec. 401. Life-Cycle Cost Analysis. Agencies shall use
                life-cycle cost analysis in making decisions about
                their investments in products, services, construction,
                and other projects to lower the Federal Government's
                costs and to reduce energy and water consumption. Where
                appropriate, agencies shall consider the life-cycle
                costs of combinations of projects, particularly to
                encourage bundling of energy efficiency projects with
                renewable energy projects. Agencies shall also retire
                inefficient equipment on an accelerated basis where
                replacement results in lower life-cycle costs. Agencies
                that minimize life-cycle costs with efficiency measures
                will be recognized in their scorecard evaluations.
                Sec. 402. Facility Energy Audits. Agencies shall
                continue to conduct energy and water audits for
                approximately 10 percent of their facilities each year,
                either independentlyor through Energy-Savings
                Performance Contracts or utility energy-efficiency
                service contracts.
                Sec. 403. Energy Management Strategies and Tools.
                Agencies shall use a variety of energy management
                strategies and tools, where life-cycle cost-effective,
                to meet the goals of this order. An agency's use of
                these strategies and tools shall be taken into account
                in assessing the agency's progress and formulating its
                scorecard.
                    (a) Financing Mechanisms. Agencies shall maximize
                their use of available alternative financing
                contracting mechanisms, including Energy-Savings
                Performance Contracts and utility energy-efficiency
                service contracts, when life-cycle cost-effective, to
                reduce energy use and cost in their facilities and
                operations. Energy-Savings Performance Contracts, which
                are authorized under the National Energy Conservation
                Policy Act, as modified by the Energy Policy Act of
                1992, and utility energy-efficiency service contracts
                provide significant opportunities for making Federal
                facilities more energy efficient at no net cost to
                taxpayers.
                    (b) ENERGY STAR and Other Energy
                Efficient Products.
                      (1) Agencies shall select, where life-cycle cost-
                effective, ENERGY STAR and other energy
                efficient products when acquiring energy-using
                products. For product groups where ENERGY
                STAR labels are not yet available, agencies
                shall select products that are in the upper 25 percent
                of energy efficiency as designated by FEMP. The
                Environmental Protection Agency (EPA) and DOE shall
                expedite the process of designating products as ENERGY
                STAR and will merge their current efficiency
                rating procedures.
                      (2) GSA and the Defense Logistics Agency (DLA),
                with assistance from EPA and DOE, shall create clear
                catalogue listings that designate these
[[Page 30855]]
                products in both print and electronic formats. In
                addition, GSA and DLA shall undertake pilot projects
                from selected energy-using products to show a ``second
                price tag'', which means an accounting of the operating
                and purchase costs of the item, in both printed and
                electronic catalogues and assess the impact of
                providing this information on Federal purchasing
                decisions.
                      (3) Agencies shall incorporate energy efficient
                criteria consistent with ENERGY STAR and
                other FEMP-designated energy efficiency levels into all
                guide specifications and project specifications
                developed for new construction and renovation, as well
                as into product specification language developed for
                Basic Ordering Agreements, Blanket Purchasing
                Agreements, Government Wide Acquisition Contracts, and
                all other purchasing procedures.
                      (4) DOE and OMB shall also explore the creation
                of financing agreements with private sector suppliers
                to provide private funding to offset higher up-front
                costs of efficient products. Within 9 months of the
                date of this order, DOE shall report back to the
                President's Management Council on the viability of such
                alternative financing options.
                    (c) ENERGY STAR Buildings. Agencies shall
                strive to meet the ENERGY STAR Building
                criteria for energy performance and indoor
                environmental quality in their eligible facilities to
                the maximum extent practicable by the end of 2002.
                Agencies may use Energy-Savings Performance Contracts,
                utility energy-efficiency service contracts, or other
                means to conduct evaluations and make improvements to
                buildings in order to meet the criteria. Buildings that
                rank in the top 25 percent in energy efficiency
                relative to comparable commercial and Federal buildings
                will receive the ENERGY STAR building label.
                Agencies shall integrate this building rating tool into
                their general facility audits.
                    (d) Sustainable Building Design. DOD and GSA, in
                consultation with DOE and EPA, shall develop
                sustainable design principles. Agencies shall apply
                such principles to the siting, design, and construction
                of new facilities. Agencies shall optimize life-cycle
                costs, pollution, and other environmental and energy
                costs associated with the construction, life-cycle
                operation, and decommissioning of the facility.
                Agencies shall consider using Energy-Savings
                Performance Contracts or utility energy-efficiency
                service contracts to aid them in constructing
                sustainably designed buildings.
                    (e) Model Lease Provisions. Agencies entering into
                leases, including the renegotiation or extension of
                existing leases, shall incorporate lease provisions
                that encourage energy and water efficiency wherever
                life-cycle cost-effective. Build-to-suit lease
                solicitations shall contain criteria encouraging
                sustainable design and development, energy efficiency,
                and verification of building performance. Agencies
                shall include a preference for buildings having the
                ENERGY STAR building label in their selection
                criteria for acquiring leased buildings. In addition,
                all agencies shall encourage lessors to apply for the
                ENERGY STAR building label and to explore and
                implement projects that would reduce costs to the
                Federal Government, including projects carried out
                through the lessors' Energy-Savings Performance
                Contracts or utility energy-efficiency service
                contracts.
                    (f) Industrial Facility Efficiency Improvements.
                Agencies shall explore efficiency opportunities in
                industrial facilities for steam systems, boiler
                operation, air compressor systems, industrial
                processes, and fuel switching, including cogeneration
                and other efficiency and renewable energy technologies.
                    (g) Highly Efficient Systems. Agencies shall
                implement district energy systems, and other highly
                efficient systems, in new construction or retrofit
                projects when life-cycle cost-effective. Agencies shall
                consider combined cooling, heat, and power when
                upgrading and assessing facility power needs and shall
                use combined cooling, heat, and power systems when
                life-cycle cost-effective. Agencies shall survey local
                natural resources to optimize use
[[Page 30856]]
                of available biomass, bioenergy, geothermal, or other
                naturally occurring energy sources.
                    (h) Off-Grid Generation. Agencies shall use off-
                grid generation systems, including solar hot water,
                solar electric, solar outdoor lighting, small wind
                turbines, fuel cells, and other off-grid alternatives,
                where such systems are life-cycle cost-effective and
                offer benefits including energy efficiency, pollution
                prevention, source energy reductions, avoided
                infrastructure costs, or expedited service.
                Sec. 404. Electricity Use. To advance the greenhouse
                gas and renewable energy goals of this order, and
                reduce source energy use, each agency shall strive to
                use electricity from clean, efficient, and renewable
                energy sources. An agency's efforts in purchasing
                electricity from efficient and renewable energy sources
                shall be taken into account in assessing the agency's
                progress and formulating its score card.
                    (a) Competitive Power. Agencies shall take
                advantage of competitive opportunities in the
                electricity and natural gas markets to reduce costs and
                enhance services. Agencies are encouraged to aggregate
                demand across facilities or agencies to maximize their
                economic advantage.
                    (b) Reduced Greenhouse Gas Intensity of Electric
                Power. When selecting electricity providers, agencies
                shall purchase electricity from sources that use high
                efficiency electric generating technologies when life-
                cycle cost-effective. Agencies shall consider the
                greenhouse gas intensity of the source of the
                electricity and strive to minimize the greenhouse gas
                intensity of purchased electricity.
                    (c) Purchasing Electricity from Renewable Energy
                Sources.
                      (1) Each agency shall evaluate its current use of
                electricity from renewable energy sources and report
                this level in its annual report to the President. Based
                on this review, each agency should adopt policies and
                pursue projects that increase the use of such
                electricity. Agencies should include provisions for the
                purchase of electricity from renewable energy sources
                as a component of their requests for bids whenever
                procuring electricity. Agencies may use savings from
                energy efficiency projects to pay additional
                incremental costs of electricity from renewable energy
                sources.
                      (2) In evaluating opportunities to comply with
                this section, agencies should consider: my
                Administration's goal of tripling nonhydroelectric
                renewable energy capacity in the United States by 2010;
                the renewable portfolio standard specified in the
                restructuring guidelines for the State in which the
                facility is located; GSA's efforts to make electricity
                from renewable energy sources available to Federal
                electricity purchasers; and EPA's guidelines on
                crediting renewable energy power in implementation of
                Clean Air Act standards.
                Sec. 405. Mobile Equipment. Each agency shall seek to
                improve the design, construction, and operation of its
                mobile equipment, and shall implement all life-cycle
                cost-effective energy efficiency measures that result
                in cost savings while improving mission performance. To
                the extent that such measures are life-cycle cost-
                effective, agencies shall consider enhanced use of
                alternative or renewable-based fuels.
                Sec. 406. Management and Government Performance.
                Agencies shall use the following management strategies
                in meeting the goals of this order.
                    (a) Awards. Agencies shall use employee incentive
                programs to reward exceptional performance in
                implementing this order.
                    (b) Performance Evaluations. Agencies shall include
                successful implementation of provisions of this order
                in areas such as Energy-Savings Performance Contracts,
                sustainable design, energy efficient procurement,
                energy efficiency, water conservation, and renewable
                energy projects in the position descriptions and
                performance evaluations of agency heads, members of the
                agency energy team, principal program managers, heads
                of field offices, facility managers, energy managers,
                and other appropriate employees.
[[Page 30857]]
                    (c) Retention of Savings and Rebates. Agencies
                granted statutory authority to retain a portion of
                savings generated from efficient energy and water
                management are encouraged to permit the retention of
                the savings at the facility or site where the savings
                occur to provide greater incentive for that facility
                and its site managers to undertake more energy
                management initiatives, invest in renewable energy
                systems, and purchase electricity from renewable energy
                sources.
                    (d) Training and Education. Agencies shall ensure
                that all appropriate personnel receive training for
                implementing this order.
                      (1) DOE, DOD, and GSA shall provide relevant
                training or training materials for those programs that
                they make available to all Federal agencies relating to
                the energy management strategies contained in this
                order.
                      (2) The Federal Acquisition Institute and the
                Defense Acquisition University shall incorporate into
                existing procurement courses information on Federal
                energy management tools, including Energy-Savings
                Performance Contracts, utility energy-efficiency
                service contracts, ENERGY STAR and other
                energy efficient products, and life-cycle cost
                analysis.
                      (3) All agencies are encouraged to develop
                outreach programs that include education, training, and
                promotion of ENERGY STAR and other energy-
                efficient products for Federal purchase card users.
                These programs may include promotions with billing
                statements, user training, catalogue awareness, and
                exploration of vendor data collection of purchases.
                    (e) Showcase Facilities. Agencies shall designate
                exemplary new and existing facilities with significant
                public access and exposure as showcase facilities to
                highlight energy or water efficiency and renewable
                energy improvements.
                PART 5--TECHNICAL ASSISTANCE
                Sec. 501. Within 120 days of this order, the Director
                of OMB shall:
                    (a) develop and issue guidance to agency budget
                officers on preparation of annual funding requests
                associated with the implementation of the order for the
                FY 2001 budget;
                    (b) in collaboration with the Secretary of Energy,
                explain to agencies how to retain savings and reinvest
                in other energy and water management projects; and
                    (c) in collaboration with the Secretary of Energy
                through the Office of Federal Procurement Policy,
                periodically brief agency procurement executives on the
                use of Federal energy management tools, including
                Energy-Savings Performance Contracts, utility energy-
                efficiency service contracts, and procurement of energy
                efficient products and electricity from renewable
                energy sources.
                Sec. 502. Within 180 days of this order, the Secretary
                of Energy, in collaboration with other agency heads,
                shall:
                    (a) issue guidelines to assist agencies in
                measuring energy per square foot, per unit of
                production, or other applicable unit in industrial,
                laboratory, research, and other energy-intensive
                facilities;
                    (b) establish criteria for determining which
                facilities are exempt from the order. In addition, DOE
                must provide guidance for agencies to report proposed
                exemptions;
                    (c) develop guidance to assist agencies in
                calculating appropriate energy baselines for previously
                exempt facilities and facilities occupied after 1990 in
                order to measure progress toward goals;
                    (d) issue guidance to clarify how agencies
                determine the life-cycle cost for investments required
                by the order, including how to compare different energy
                and fuel options and assess the current tools;
                    (e) issue guidance for providing credit toward
                energy efficiency goals for cost-effective projects
                where source energy use declines but site energy use
                increases; and
[[Page 30858]]
                    (f) provide guidance to assist each agency to
                determine a baseline of water consumption.
                Sec. 503. Within 1 year of this order, the Secretary of
                Energy, in collaboration with other agency heads,
                shall:
                    (a) provide guidance for counting renewable and
                highly efficient energy projects and purchases of
                electricity from renewable and highly efficient energy
                sources toward agencies' progress in reaching
                greenhouse gas and energy reduction goals;
                    (b) develop goals for the amount of energy
                generated at Federal facilities from renewable energy
                technologies;
                    (c) support efforts to develop standards for the
                certification of low environmental impact hydropower
                facilities in order to facilitate the Federal purchase
                of such power;
                    (d) work with GSA and DLA to develop a plan for
                purchasing advanced energy products in bulk quantities
                for use in by multiple agencies;
                    (e) issue guidelines for agency use estimating the
                greenhouse gas emissions attributable to facility
                energy use. These guidelines shall include emissions
                associated with the production, transportation, and use
                of energy consumed in Federal facilities; and
                    (f) establish water conservation goals for Federal
                agencies.
                Sec. 504. Within 120 days of this order, the Secretary
                of Defense and the Administrator of GSA, in
                consultation with other agency heads, shall develop and
                issue sustainable design and development principles for
                the siting, design, and construction of new facilities.
                Sec. 505. Within 180 days of this order, the
                Administrator of GSA, in collaboration with the
                Secretary of Defense, the Secretary of Energy, and
                other agency heads, shall:
                    (a) develop and issue guidance to assist agencies
                in ensuring that all project cost estimates, bids, and
                agency budget requests for design, construction, and
                renovation of facilities are based on life-cycle costs.
                Incentives for contractors involved in facility design
                and construction must be structured to encourage the
                contractors to design and build at the lowest life-
                cycle cost;
                    (b) make information available on opportunities to
                purchase electricity from renewable energy sources as
                defined by this order. This information should
                accommodate relevant State regulations and be updated
                periodically based on technological advances and market
                changes, at least every 2 years;
                    (c) develop Internet-based tools for both GSA and
                DLA customers to assist individual and agency
                purchasers in identifying and purchasing ENERGY
                STAR and other energy efficient products for
                acquisition; and
                    (d) develop model lease provisions that incorporate
                energy efficiency and sustainable design.
                PART 6--GENERAL PROVISIONS
                Sec. 601. Compliance by Independent Agencies.
                Independent agencies are encouraged to comply with the
                provisions of this order.
                Sec. 602. Waivers. If an agency determines that a
                provision in this order is inconsistent with its
                mission, the agency may ask DOE for a waiver of the
                provision. DOE will include a list of any waivers it
                grants in its Federal Energy Management Programs annual
                report to the Congress.
                Sec. 603. Scope. (a) This order is intended only to
                improve the internal management of the executive branch
                and is not intended to create any right, benefit, or
                trust responsibility, substantive or procedural,
                enforceable by law by a party against the United
                States, its agencies, its officers, or any other
                person.
                    (b) This order applies to agency facilities in any
                State of the United States, the District of Columbia,
                the Commonwealth of Puerto Rico, Guam,
[[Page 30859]]
                American Samoa, the United States Virgin Islands, the
                Northern Mariana Islands, and any other territory or
                possession over which the United States has
                jurisdiction. Agencies with facilities outside of these
                areas, however, are encouraged to make best efforts to
                comply with the goals of this order for those
                facilities. In addition, agencies can report energy
                improvements made outside the United States in their
                annual report to the President; these improvements may
                be considered in agency scorecard evaluations.
                Sec. 604. Revocations. Executive Order 12902 of March
                9, 1994, Executive Order 12759 of April 17, 1991, and
                Executive Order 12845 of April 21, 1993, are revoked.
                Sec. 605. Amendments to Federal Regulations. The
                Federal Acquisition Regulation and other Federal
                regulations shall be amended to reflect changes made by
                this order, including an amendment to facilitate agency
                purchases of electricity from renewable energy sources.
                PART 7--DEFINITIONS
                For the purposes of this order:
                Sec. 701. ``Acquisition'' means acquiring by contract
                supplies or services (including construction) by and
                for the use of the Federal Government through purchase
                or lease, whether the supplies or services are already
                in existence or must be created, developed,
                demonstrated, and evaluated. Acquisition begins at the
                point when agency needs are established and includes
                the description of requirements to satisfy agency
                needs, solicitation and selection of sources, award of
                contracts, contract financing, contract performance,
                contract administration, and those technical and
                management functions directly related to the process of
                fulfilling agency needs by contract.
                Sec. 702. ``Agency'' means an executive agency as
                defined in 5 U.S.C. 105. For the purpose of this order,
                military departments, as defined in 5 U.S.C. 102, are
                covered under the auspices of DOD.
                Sec. 703. ``Energy-Savings Performance Contract'' means
                a contract that provides for the performance of
                services for the design, acquisition, financing,
                installation, testing, operation, and where
                appropriate, maintenance and repair, of an identified
                energy or water conservation measure or series of
                measures at one or more locations. Such contracts shall
                provide that the contractor must incur costs of
                implementing energy savings measures, including at
                least the cost (if any) incurred in making energy
                audits, acquiring and installing equipment, and
                training personnel in exchange for a predetermined
                share of the value of the energy savings directly
                resulting from implementation of such measures during
                the term of the contract. Payment to the contractor is
                contingent upon realizing a guaranteed stream of future
                energy and cost savings. All additional savings will
                accrue to the Federal Government.
                Sec. 704. ``Exempt facility'' or ``Exempt mobile
                equipment'' means a facility or a piece of mobile
                equipment for which an agency uses DOE-established
                criteria to determine that compliance with the Energy
                Policy Act of 1992 or this order is not practical.
                Sec. 705. ``Facility'' means any individual building or
                collection of buildings, grounds, or structure, as well
                as any fixture or part thereof, including the
                associated energy or water-consuming support systems,
                which is constructed, renovated, or purchased in whole
                or in part for use by the Federal Government. It
                includes leased facilities where the Federal Government
                has a purchase option or facilities planned for
                purchase. In any provision of this order, the term
                ``facility'' also includes any building 100 percent
                leased for use by the Federal Government where the
                Federal Government pays directly or indirectly for the
                utility costs associated with its leased space. The
                term also includes Government-owned contractor-operated
                facilities.
                Sec. 706. ``Industrial facility'' means any fixed
                equipment, building, or complex for production,
                manufacturing, or other processes that uses large
                amounts of capital equipment in connection with, or as
                part of, any process
[[Page 30860]]
                or system, and within which the majority of energy use
                is not devoted to the heating, cooling, lighting,
                ventilation, or to service the water heating energy
                load requirements of the facility.
                Sec. 707. ``Life-cycle costs'' means the sum of the
                present values of investment costs, capital costs,
                installation costs, energy costs, operating costs,
                maintenance costs, and disposal costs, over the
                lifetime of the project, product, or measure.
                Additional guidance on measuring life-cycle costs is
                specified in 10 C.F.R. 436.19.
                Sec. 708. ``Life-cycle cost-effective'' means the life-
                cycle costs of a product, project, or measure are
                estimated to be equal to or less than the base case
                (i.e., current or standard practice or product).
                Additional guidance on measuring cost-effectiveness is
                specified in 10 C.F.R. 436.18 (a), (b), and (c),
                436.20, and 436.21.
                Sec. 709. ``Mobile equipment'' means all Federally
                owned ships, aircraft, and nonroad vehicles.
                Sec. 710. ``Renewable energy'' means energy produced by
                solar, wind, geothermal, and biomass power.
                Sec. 711. ``Renewable energy technology'' means
                technologies that use renewable energy to provide
                light, heat, cooling, or mechanical or electrical
                energy for use in facilities or other activities. The
                term also means the use of integrated whole-building
                designs that rely upon renewable energy resources,
                including passive solar design.
                Sec. 712. ``Source energy'' means the energy that is
                used at a site and consumed in producing and in
                delivering energy to a site, including, but not limited
                to, power generation, transmission, and distribution
                losses, and that is used to perform a specific
                function, such as space conditioning, lighting, or
                water heating.
                Sec. 713. ``Utility'' means public agencies and
                privately owned companies that market, generate, and/or
                distribute energy or water, including electricity,
                natural gas, manufactured gas, steam, hot water, and
                chilled water as commodities for public use and that
                provide the service under Federal, State, or local
                regulated authority to all authorized customers.
                Utilities include: Federally owned nonprofit producers;
                municipal organizations; and investor or privately
                owned producers regulated by a State and/or the Federal
                Government; cooperatives owned by members and providing
                services mostly to their members; and other nonprofit
                State and local government agencies serving in this
                capacity.
                Sec. 714. ``Utility energy-efficiency service'' means
                demand side management services provided by a utility
                to improve the efficiency of use of the commodity
                (electricity, gas, etc.) being distributed. Services
                can include, but are not limited to, energy efficiency
                and renewable energy project auditing, financing,
                design, installation, operation, maintenance, and
                monitoring.
                    (Presidential Sig.)
                THE WHITE HOUSE,
                    June 3, 1999.
[FR Doc. 99-14633
Filed 6-7-99; 8:45 am]
Billing code 3195-01-P